Collision prevention between tower planes
If the operation area of two tower cranes overlaps, each part of them will interfere with each other (including tower arm, tower body, steel wire rope, mast, etc.). If the coordination is not proper, it may collide with each other and cause serious consequences.
It is possible to have two tower machines running at the optimal speed and in the optimal way on the basis of ensuring absolute safety, so that multiple tower machines can be placed on the construction site without having to spend too much energy on how to deal with their interference problems.
Support two-level anti-collision network, as many as 128 tower anti-collision, far higher than competitors.
The relationship between tower cranes can be manually set to adapt to the actual application environment.
Tower tower area protection
If the tower crane tower arm, hook and wire rope collide with obstacles, or the delivered goods fall into sensitive areas (such as schools, squares, railways, high-voltage lines……) Can lead to serious consequences. HTA-SPS16 can prevent the hook or tower arm from approaching sensitive areas to avoid such accidents.
Up to ten sensitive areas can be set freely
How point – to – point arbitrary polygons are set
Operational boundary protection
Usually the work scope of the tower crane is limited within the boundary of the construction site. If the tower crane hook runs outside the boundary, it will often bring fear to the personnel outside the site and cause bad social impact. If the goods fall outside the site, it is possible to cause serious consequences. The operation range of the tower crane can be limited to avoid the above risks.
Illegal operation identification and control
The operation status of the tower crane is detected at any time and the risk is estimated. When approaching the danger, the operator is given a prompt signal. If the operator is still operating in the dangerous direction, the control signal can be issued to prohibit the tower crane from continuing to get close to the dangerous area to avoid the accident caused by the operation error.
Fault diagnosis and prompt
It can automatically detect the running state of each component of the system itself, and if there is a fault, it can send a prompt to the operator and the monitoring center, so as to help relevant personnel to troubleshoot the fault as soon as possible.
Wireless communication
Equipped with a dedicated wireless communication module, its stability and reliability has reached the first-class level, can ensure that multiple tower cranes work at the same time, no mutual interference when communicating with each other. This allows the installation of the system without laying long lines, and also avoids the problems caused by line failure in traditional equipment.